🗺 Every page — the whole flow
The votes
Open questionsElections — when, where, howVoter turnoutPriorities boardWhat came of itGet involved
The budget
▶ Take the 2-minute tourThe money trailYour tax bill, explainedCities & townsGrants — money we could go getWho gets paidWhat the auditors reportedThe receipt — arithmetic checkedThe documentsHow every number is sourcedQuestions people ask — answered from the dataThe plain-words tour
Public needs
Our waterJails & prisons — from holding to buildingWho’s watching — cameras, plate readers, the rulesWho to call — county and state officesFind help
Dead ends & open questions
The docketThe calendarHow complete is this county?
Research for a better county
What if we saved?Tax lab — change the taxesCommonwealth — our own moneyReceipts by railsFood sovereigntyGrow-opsThe food flywheelThe two potsFeeding the countyThe growing frontierThe grower’s almanacThe $400K blueprintThe research shelfThe precedents
The wider network
All countiesKindred workWhere we sit in the field
How to trust this
Where we standWhat we will never doHow this is securedThe traffic logOur storyReport a problem
Smith County, Texas · water

Our water

Clean water is the one public service every person uses every day. This page shows what the records say about ours, and the options for keeping it safe and affordable as we grow — each graded honestly: proven, piloted, or still in the lab. Updated 2026-09-26.

Tyler’s water — from the utility’s own records

Tyler owns its water and sewer system (Tyler Water Utilities, a city department), paid for by water and sewer bills. Rural Smith County is served largely by water supply corporations — nonprofits owned by their members.

SourcesLake Tyler and Lake Tyler East feed the Golden Road plant; Lake Palestine feeds the Lake Palestine plant.
Tyler 2025 Drinking Water Quality Report
OwnerThe City of Tyler (Texas public water system 2120004).
City of Tyler — Drinking Water
Water lostAn estimated 2,084,630,147 gallons in 2025 — over 2 billion gallons — per the water-loss audit Tyler filed with the Texas Water Development Board.
Tyler 2025 Drinking Water Quality Report
SewerUnder a 2017 federal consent decree after years of sewer overflows: a $563,000 penalty, and fixes EPA estimated could cost more than $65 million. Overflows are down from about 15 to 6.9 per 100 miles of pipe (50 in 2025); the goal is under 5.
EPA — Tyler Clean Water Act settlement · City of Tyler — consent decree progress
Lead pipesOf about 40,000 service lines, 142 are lead (0.37%) and 3,843 are galvanized steel needing replacement (9.91%). The city plans to finish replacements by 2037.
City of Tyler — service line inventory
RatesFor 2026–27 the base water rate stays at $3.75 per 1,000 gallons for the first 25,000 gallons; the budget cash-funds $13.6 million of water and wastewater projects.
Tyler Morning Telegraph, Sept 10, 2026
Rural waterJackson Water Supply Corporation, for example, is member-owned and board-managed, serving the Chapel Hill and Arp area since 1967 from five deep Carrizo-Wilcox wells.
Jackson WSC · Texas Water Code ch. 67

What’s in the water — the latest report

Tyler’s 2025 report lists no violation notices.

MeasureResultLimit
Chlorine byproducts (TTHM)58 ppb highest running average80
Chlorine byproducts (HAA5)40 ppb highest running average60
Lead (2021–2023 tap tests)
No homes over the action level.
0 ppb at the 90th percentile (highest single test 6.55)15 action level
Copper (2021–2023 tap tests)0 ppm at the 90th percentile (highest 0.11)1.3 action level

Total organic carbon removal met every requirement in 2025.

Sewer plants: a June 2024 storm knocked out power at the Westside plant and 3,953,070 gallons of sewage reached Black Fork Creek. Separately, the state fined the Southside plant $23,250 for ammonia and solids over its limits (Dec 2023–Apr 2024) during a $16 million upgrade; most was offset by an environmental project and $4,650 was paid.

The city’s report doesn’t include PFAS (“forever chemical”) results (Docket #8). Sources: Tyler 2025 Drinking Water Quality Report · KLTV, June 2024 · KLTV, Aug 2026

What fits here — proven options matched to what the records show

Find the water we’re losing
Over 2 billion gallons were lost in 2025 — water already pumped and treated. What share of production that is, and what it costs, isn’t stated in the report (Docket #9). Leak-finding meters are the proven first step.
Finish the sewer fixes, then keep them fixed
The overflow rate has dropped by more than half since 2017; the consent decree’s goal is under 5 per 100 miles. Backup power at plants is the lesson of the 2024 spill.
Replace the 3,985 lead and galvanized lines
Federal lead-pipe money flows through the state revolving fund — the sooner it’s used, the sooner the 2037 target moves up.
Protect the lakes
All of Tyler’s treated water starts in three lakes; keeping their watersheds healthy is the cheapest treatment there is.

The open question: Who pays for the sewer fixes, and how much have they cost so far against EPA’s $65 million estimate? The records we have don’t total it yet (Docket #10). See the docket.

Our proposal — proposed by County Commons

Put a living filter first

Chlorine byproducts form when chlorine meets the natural organic matter in river and lake water. A living filter — a bed of sand, or the ground beside a river, where bacteria feed on that organic matter — takes out part of it before treatment starts. Biology makes the first cut; the plant finishes the job with less to fight.

Why here: Tyler’s 2025 report shows trihalomethanes at a highest average of 58 ppb (limit 80), and organic carbon in its lake water as high as 8.81 mg/L — the raw material byproducts form from. Tyler 2025 Drinking Water Quality Report

The evidence:

The honest limits:

  • A living filter alone isn’t enough. Chemical treatment with activated carbon removes more byproduct-forming matter (a trade source reports 75–80%). This is a first stage, not a replacement.
  • Results swing widely from site to site. Riverbank filtration needs the right sand and gravel beside the river.
  • It takes land, and a pilot test before anything is built.
  • Engineers can also cut byproducts by changing where or how water is disinfected. The right mix is a design question for the utility.

Water Online

First step: A pilot at the Golden Road or Lake Palestine plant: a small biological or slow-sand filter ahead of treatment, measuring organic carbon and byproducts before and after. Tyler draws from lakes, so riverbank filtration doesn’t apply; living wetlands upstream are less proven for drinking water and would need their own study.

Weigh in on the open question →

This is a proposal, labeled as one. The records above are the facts; whether to do this is for residents and the people they elect to decide.

The options — graded A (proven), B (piloted), C (lab stage)

Drinking water

Find the water you’re losing A · Proven

Smart meters plus listening devices on the pipes find leaks early. Every gallon lost was already pumped and treated. Hot Springs, Arkansas cut water it couldn’t account for from 44% to 24%, and found one broken valve wasting about 4 million gallons a day (the meter company’s case study).

Limit: The case study comes from the company that sold the system. Savings depend on how leaky the pipes are to begin with. Xylem case study, Hot Springs

Let bacteria clean it first (biological filtration) A · Proven

A living layer on the sand or carbon filter eats organic matter and ammonia — with fewer chemicals. Less organic matter means fewer chlorine byproducts later. Slow sand filters work this way. Slow sand filters have run for more than 150 years; several U.S. utilities have converted filters to biological operation.

Limit: It doesn’t remove “forever chemicals” (PFAS) by itself, and slow sand filters need land. Biofiltration review, 2016 · Hazen and Sawyer

Disinfect with UV light A · Proven

Ultraviolet light kills germs without adding a chemical, so less chlorine is needed. Adding hydrogen peroxide under UV (advanced oxidation) breaks down trace chemicals too.

Limit: Some chlorine is still needed to keep water safe inside the pipes. Trojan Technologies

Let the riverbank filter it A · Proven

Wells beside a river pull water through natural sand and gravel, which filters it before it reaches the plant. Louisville Water in Kentucky uses riverbank filtration.

Limit: Only works where the ground next to the river is the right kind of sand and gravel — that takes a study. Louisville Water

Membranes (ultrafiltration) A · Proven

Very fine filters physically block germs and particles. Packaged systems are sold for small towns.

Limit: Membranes need cleaning and replacing, and they use electricity. AMTA

Remove “forever chemicals” (PFAS) A · Proven

Activated carbon, ion exchange, and reverse osmosis remove PFAS. Destroying PFAS completely (supercritical water, electrochemical methods) is still in pilots.

Limit: EPA set PFAS limits in 2024. In 2026 it proposed pushing the main deadline from 2029 to 2031 and dropping limits for four of the six chemicals — both still proposals. Test first, then decide. EPA · PFAS destruction review · EPA — proposed extension · EPA — proposed rescission

Protect the source A · Proven

Keeping the watershed healthy — forests, stream banks, fixing upstream sewage — is usually cheaper than treating dirty water. New York City protected its Catskill watershed instead of building a filtration plant estimated at up to $10 billion.

Limit: New York’s dollars don’t scale down; the idea does. PERC

Wastewater

Constructed wetlands A · Proven

Planted, shallow basins where plants, soil, and microbes clean treated wastewater further. EPA guidance calls them well suited to small towns “where inexpensive land is available.”

Limit: Needs land, and works slower in cold weather. Univ. of Arizona, summarizing EPA guidance

Algae on moving belts B · Piloted

Algae grow on belts that rotate through lagoon water, pulling out phosphorus and nitrogen. The harvested algae can become fertilizer. Gross-Wen Technologies (Iowa) — at least eight systems running in Iowa and Illinois.

Limit: Still young, and algae slow down in winter. Iowa State · phys.org, 2023

Duckweed, fungi, and “living machines” C · Lab stage

Floating plants, fungal filters, and greenhouse ecosystems that clean water. Duckweed pulled more than 93% of nitrogen and phosphorus from wastewater in a study.

Limit: Strong study results, few full-size town plants to copy. Treat as a supplement, not a whole plant. Duckweed study (MDPI) · Oberlin’s Living Machine

Recover energy and fertilizer A · Proven

Digesting sludge makes biogas; phosphorus can be recovered as a fertilizer. Tigard, Oregon became the first U.S. plant to recycle nutrients into commercial fertilizer (Ostara, 2009).

Limit: Usually pays off only at bigger plants. Ostara

New materials

Metamaterials and solar evaporation C · Lab stage

Engineered surfaces that soak up sunlight to evaporate and purify water.

Limit: Researchers say fouling, cost, and scale still need to be solved. No utility runs it. research review · J. Mater. Chem. A, 2022

Graphene membranes C · Lab stage

Ultra-thin carbon membranes that could filter faster with less energy.

Limit: Research says most use is “still limited to laboratory scale.” No U.S. water utility uses them as its main filter yet. ACS Environmental Au review

Who owns it, and how it’s paid for

Look up any system yourself: EPA — find your report · EPA ECHO · EPA SDWIS · EPA UCMR data · TCEQ

Related: Commonwealth — our own money · Grow-ops. This page lays out options and their records; it doesn’t choose for anyone. Spot an error? Report it.